Your Ingram Team
J.D. Ingram
Chairman
He has been in mausoleum design/construction for over 33 years.
Jeff D. Ingram
President
He has been in mausoleum design/construction since 1988.
Kelton Ingram
VP of Production
Production Division
He has been in mausoleum design/construction for over 30 years.
Al Starkey
Vice President of Sales
Sales Division
He has been in mausoleum design/construction since 1991.
![Rob Sinclair](https://communitymaus.wpenginepowered.com/wp-content/uploads/2013/01/r-sinclair.jpg)
Rob M. Sinclair
Design Supervisor
Architectural Division
He has been in mausoleum design/construction since 2005.
![Wanda Foshee](https://communitymaus.wpenginepowered.com/wp-content/uploads/2013/01/w-foshee.jpg)
Wanda Foshee
Project Coordinator
Production Division
She has been in mausoleum design/construction for over 26 years.
![Ken Gower](https://communitymaus.wpenginepowered.com/wp-content/uploads/2013/01/k-gower.jpg)
Ken Gower
CAD Designer
Architectural Division
He has been in mausoleum design/construction since 1992.
![Eric Blackmon](https://communitymaus.wpenginepowered.com/wp-content/uploads/2013/01/e-blackmon.jpg)
Eric Blackmon
CAD Draftsman
Architectural Division
He has been in mausoleum design/construction since 2008.
![John Akers](https://communitymaus.wpenginepowered.com/wp-content/uploads/2013/01/j-akers.jpg)
John Akers
Estimator
He has been in mausoleum design/construction since 1996.
![Alyson Sparks](https://communitymaus.wpenginepowered.com/wp-content/uploads/2013/01/a-sparks.jpg)
Alyson Sparks
Executive Assistant
She has been in mausoleum design/construction since 2001.